⏵ NEW · AR MEASUREMENT ON LIDAR DEVICES · LIVE NOW
§ Sheet BL / 06 · Blog

JOBSITE.
HONEST.

Field-tested takes on bidding, takeoff, materials pricing, and the trade-software stack. Written for contractors, not pundits.
§ Latest · page 2/2

WHAT WE'VE WRITTEN.

Manual D Duct Sizing: The Half of HVAC Most Bids Get Wrong

Why most HVAC systems that pass Manual J still fail in the field — and how to bid Manual D so the install actually delivers the airflow the equipment is rated for.

2025-04-08
The Hidden Cost of a Bad Estimating Workflow

The "savings" of free spreadsheet bids cost the average residential contractor $36,000/year in lost margin. Here's where the money actually leaks.

2025-03-14
Drywall Estimating: Per Sheet vs Per Square Foot (and When Each Wins)

A working drywall contractor's breakdown of when to bid by the sheet, when to bid by the square foot, and the waste factor that splits the two.

2025-02-19
Why Most Contractors Lose Money on Change Orders

Change orders should be the most profitable hour on the job. Most contractors run them at break-even or worse. Here's the leak — and the four-line contract clause that fixes it.

2025-01-21
A Takeoff Workflow That Doesn't Eat Your Whole Day

The four-step takeoff workflow we see in the highest-volume residential contractors — and what to drop if your takeoff is currently a half-day exercise.

2024-12-09
Markup vs Margin: The Two-Number Mistake That Costs Contractors Real Money

If you think a 30% markup makes a 30% margin, you're losing 7 cents on every dollar. The fix is 90 seconds of math and a template that does it for you.

2024-11-12
Solar PV System Sizing: A Contractor's Bid-Day Guide

How to size a residential PV system from a kWh bill and a roof plane — including the inverter sizing, conductor sizing, and NEC 690 gotchas that wreck margin.

2024-10-15
Residential vs Commercial Estimating: Where the Math Diverges

Why the bid you'd write for a 2,400 sq ft custom home is the wrong bid for a 24,000 sq ft tilt-up — and what to change in your workflow when you cross the line.

2024-09-27
How to Bid a Roofing Job Profitably (Tear-Off to Cleanup)

A working contractor's breakdown of every line item that belongs on a residential reroof bid — from underlayment selection to the dumpster fee most bids leave out.

2024-08-22
Concrete Cost Per Cubic Yard: A Contractor's Bid Reference

Ready-mix prices, regional swings, delivery surcharges, and the line items most concrete contractors forget on bid day. With a worked example.

2024-06-18
Manual J Load Calculations: A Bid-Day Reference for HVAC Pros

How to spec the right tonnage on a residential HVAC bid without guessing. Manual J factors, common gotchas, and how to bake them into a repeatable workflow.

2024-04-09